Translate:
China Japan Russia Spain
Home Icon > About Us > News > Panama Canal: First Water Saving Basin Filled

Panama Canal: First Water Saving Basin Filled

The Panama Canal Authority (ACP) has announced that the first water-saving basin of the Agua Clara Locks’ upper chamber has been filled to the required level in order to begin testing the basin’s emptying and filling system to confirm it is watertight. Contractor Grupo Unidos por el

WP_Post Object ( [ID] => 104723 [post_author] => 15 [post_date] => 2016-02-05 23:48:48 [post_date_gmt] => 2016-02-05 23:48:48 [post_content] =>

The Panama Canal Authority (ACP) has announced that the first water-saving basin of the Agua Clara Locks’ upper chamber has been filled to the required level in order to begin testing the basin’s emptying and filling system to confirm it is watertight. Contractor Grupo Unidos por el

[post_title] => Panama Canal: First Water Saving Basin Filled [post_excerpt] =>

The Panama Canal Authority (ACP) has announced that the first water-saving basin of the Agua Clara Locks’ upper chamber has been filled to the required level in order to begin testing the basin’s emptying and filling system to confirm it is watertight. Contractor Grupo Unidos por el

[post_status] => publish [comment_status] => open [ping_status] => closed [post_password] => [post_name] => panama-canal-first-water-saving-basin-filled [to_ping] => [pinged] => [post_modified] => 2016-02-05 23:48:48 [post_modified_gmt] => 2016-02-05 23:48:48 [post_content_filtered] => [post_parent] => 0 [guid] => http://maritime-executive.com/article/panama-canal-first-water-saving-basin-filled [menu_order] => 0 [post_type] => news [post_mime_type] => [comment_count] => 0 [filter] => raw )