Kongsberg to Equip First U.S.-Built Wind Turbine Installation Vessel
Kongsberg Maritime has received $40 million contract to supply equipment for the first Wind Turbine Installation Vessel being built in the United States. The WTIV is under construction at the...
WP_Post Object
(
[ID] => 243202
[post_author] => 5
[post_date] => 2021-03-18 20:53:33
[post_date_gmt] => 2021-03-18 20:53:33
[post_content] => Kongsberg Maritime has received $40 million contract to supply equipment for the first Wind Turbine Installation Vessel being built in the United States. The WTIV is under construction at the...
[post_title] => Kongsberg to Equip First U.S.-Built Wind Turbine Installation Vessel
[post_excerpt] => Kongsberg Maritime has received $40 million contract to supply equipment for the first Wind Turbine Installation Vessel being built in the United States. The WTIV is under construction at the...
[post_status] => publish
[comment_status] => open
[ping_status] => closed
[post_password] =>
[post_name] => kongsberg-to-equip-first-u-s-built-wind-turbine-installation-vessel
[to_ping] =>
[pinged] =>
[post_modified] => 2021-03-18 20:53:33
[post_modified_gmt] => 2021-03-18 20:53:33
[post_content_filtered] =>
[post_parent] => 0
[guid] => https://gcaptain.com/?p=148363
[menu_order] => 0
[post_type] => news
[post_mime_type] =>
[comment_count] => 0
[filter] => raw
)