Translate:
China Japan Russia Spain
Home Icon > About Us > News > Shore Power System to be Installed for Sea and River Cruise Vessels at Amsterdam by 2025

Shore Power System to be Installed for Sea and River Cruise Vessels at Amsterdam by 2025

The port authority has accelerated its shore power plans with a view to the facilities being available from the start of the 2025 cruise season.

WP_Post Object ( [ID] => 275860 [post_author] => 14 [post_date] => 2022-07-19 12:37:13 [post_date_gmt] => 2022-07-19 12:37:13 [post_content] =>

The port authority has accelerated its shore power plans with a view to the facilities being available from the start of the 2025 cruise season.

[post_title] => Shore Power System to be Installed for Sea and River Cruise Vessels at Amsterdam by 2025 [post_excerpt] => The port authority has accelerated its shore power plans with a view to the facilities being available from the start of the 2025 cruise season. [post_status] => publish [comment_status] => open [ping_status] => closed [post_password] => [post_name] => shore-power-system-to-be-installed-for-sea-and-river-cruise-vessels-at-amsterdam-by-2025 [to_ping] => [pinged] => [post_modified] => 2022-07-19 12:37:13 [post_modified_gmt] => 2022-07-19 12:37:13 [post_content_filtered] => [post_parent] => 0 [guid] => https://shipandbunker.com/news/world/405714-shore-power-system-to-be-installed-for-sea-and-river-cruise-vessels-at-amsterdam-by-2025 [menu_order] => 0 [post_type] => news [post_mime_type] => [comment_count] => 0 [filter] => raw )